Land Acquisition = 71.1851 hectares
Earthworks = 1488447.33 cubic meters
Reconstruction of pavement with hard shoulder (10.30m) = 6.571 km
Widening and strengthening of existing pavement with hard shoulder (5.50m to 10.30m) = 24.864 km
Surfacing (DBS base and wiring course) (10.30m) = 31.968 km
Widening of rigid pavement (10.30m) = 4.136 km
Construction of bus-bay = 4 meters
Development of intersections = 2 Nos
Construction of RCC box culvert = 48.00 meters
Construction of RCC U-drain cum footpath = 10072.00 meters
Construction of saucer drain = 1400.00 meters
Geotextile including CC block = 531861.00 sq.m.
Brick toe wall construction = 66398.00 meters
Planning and Implementation: Cabinet Division, A2I, BCC, DoICT and BASIS