Land acquisition = 20.57 hectares
Flexible pavement construction (including hard shoulder) (7.90m) = 4.69 km
Construction of PC girder bridge (4) = 1323.104 meters
Supply and installation of steel truss = 100.00 m
Construction of RCC slab culvert (17) = 211.50 m
Construction of RCC drain = 1800.00 m
Geo textile including CC block = 462105.75 sq.m
Construction of brick toe wall = 8552.22 m
Construction of RCC toe wall = 1800.00 m
Planning and Implementation: Cabinet Division, A2I, BCC, DoICT and BASIS